This Meridian home needed new siding. The existing lap siding had reached the end of its useful life on the west and south exposures where sun and weather concentrate. The paint had failed, the caulk at the window casings and corner boards had cracked and separated, and two sections on the west wall had moisture working behind the boards and discoloring the OSB sheathing underneath. The moisture intrusion was the most important thing to address correctly before new material went on.

The house is a two-story with three dormers on the second story and an existing brick lower level. The siding scope covered the full upper exterior: all four walls above the brick line, the dormer sidewalls and window surrounds, and all of the trim at windows and corners. The brick stays. Everything above it is new.

Removing the old siding and finding the problem

Once the old siding was off, the sheathing was inspected across the full exterior. The two areas of discoloration on the west wall turned out to be surface staining from window casing failures, not structural damage to the framing behind. The sheathing beneath was dry and the framing was intact. The window casings were rotted through and needed to be replaced before new siding went on. Replacing them at this stage is the correct time. Installing new siding over rotted window casings moves the moisture problem from behind the old siding to behind the new siding.

The two damaged sections of OSB sheathing were cut out and replaced with new panels. The cuts were made to fall on stud edges so the new panels had solid nailing on all four sides. House wrap was replaced on the sections where the original had torn or creased during removal, and new house wrap was installed where it was missing or had never been properly lapped. Getting the house wrap details right at this stage is what determines whether the new siding performs for twenty years or develops problems in five.

Olive green horizontal lap siding

The siding selection was olive green horizontal lap. Against the existing red brick lower level, the olive reads as complementary rather than competing. Green and red sit opposite each other on the color wheel, which means when both are muted and the values are close, they work together naturally. The olive green above the brick baseline gives the house a grounded, settled look that a neutral gray or beige would not have delivered on this particular exterior.

Corner boards were installed before the field siding on each wall. The windows were trimmed with new PVC casing at the jambs and head. PVC does not rot, and the original wood window casing was the source of the moisture failure on the west wall. Replacing all of the window casings with PVC eliminates that failure mechanism across the entire exterior. The additional cost of PVC casing over wood is a small number compared to the cost of dealing with the same problem again in ten years.

Lap siding installation requires careful attention to the reveal, the exposed face of each course below the course above it. That reveal needs to be consistent from one end of the wall to the other, on every course, on every wall. Inconsistent reveals produce a wavy horizontal line that is visible from the street. A chalk line was snapped for every course before any boards were nailed. The nailing pattern was kept consistent so the siding lies flat without waviness or cupping.

The three dormers

Three dormers on the second story are the most demanding part of any exterior siding job on a house like this. Each dormer has its own sidewalls, its own windows, and its own base where the dormer wall meets the main roof slope. All of those intersections have to be detailed correctly for the dormer to stay weathertight. The step flashing at the dormer base, where the siding meets the roof, is what prevents water from working behind the siding and onto the roof deck below.

Each piece of step flashing at the dormer base was set in the correct position relative to the shingle courses below it and the siding courses above it. The siding on the dormer sidewalls was cut to fit the roof pitch, with each course ending at the correct angle where the wall meets the slope. Getting three dormers in a row to all look identical from the street, with siding lines that run level across all three, requires laying out the course heights on all three dormers before the first board goes on any of them.

The window trim on the dormer windows received the same PVC casing treatment as the windows on the main walls. Each dormer window sits in its own opening in the dormer face, and the casing at the head has to be flashed properly so water running down the dormer face sheds over the casing rather than behind it. The detail is not visible in the finished product. It is what determines whether the dormer window stays dry.

White trim throughout

White trim at the windows and corners provides the contrast needed to define the building edges cleanly against the olive green field. Corner boards that are plumb and consistent in width give the exterior its vertical definition. Window trim that is the same width at every opening across all four walls and both stories makes the facade feel orderly. These are not decorative decisions, they are proportional ones, and they read from the street whether you notice them consciously or not.

The white trim also bridges the olive green siding above and the red brick below. The brick has its own texture and its own color, and the transition from brick to siding is one of the most visible joints on the exterior. White trim at that transition line, run consistently around the perimeter, gives the eye a place to rest between the two materials and makes the combination read as intentional.

How the exterior reads now

Before the project, the house had aging siding in a color that had faded unevenly, failed caulk at every window and corner, and two places on the west wall where moisture had been working behind the boards for some time. The house looked its age. After the project, it looks like a deliberate choice was made about what this house should look like, because one was.

The olive green, white, and brick combination is one that holds up over time. It is not a trendy color choice. It is a color choice that works with the existing materials on the house and reads well in the natural light conditions of a Meridian neighborhood. It will look the same in ten years.

The functional work is invisible. Replaced sheathing, new house wrap, PVC window casings, correct step flashing at all three dormers. None of that is visible from the street. It is what makes the new siding last rather than begin developing the same problems as the siding it replaced.

Licensed in Idaho (RCE# 43451) and Oregon (CCB# 205935). For a siding project in Meridian or the Treasure Valley, call or text Christian at (503) 354-4094.

The story behind this project

  1. 1

    Siding removal

    Old siding removed across the full upper exterior. Sheathing inspected for moisture damage. Two areas of water-damaged OSB on the west wall cut out and replaced before new material went on.

  2. 2

    House wrap and prep

    New house wrap installed over the full exterior. Window casings replaced with PVC at all openings on the west wall where rot was found.

  3. 3

    Dormer siding

    Step flashing detailed at each dormer base where the dormer wall meets the roof slope. Siding fitted tight around each dormer window frame.

  4. 4

    Siding installation

    Olive green horizontal lap siding installed with chalk-line course layout. Corner boards and white window trim set before field siding.

  5. 5

    Finished

    White trim completed at all windows and corners. Olive green siding above brick lower level. Full exterior finished.

Project gallery

Front facade completed siding and roof replacement on two-story Meridian home

Front facade with porch and dormers

Front gable and garage angle showing new olive green siding and charcoal roof

Front gable and garage angle

Left side exterior elevation showing new siding and rooflines

Left side exterior elevation